CSA N287.6-11 (R2016)

CSA N287.6-11 (R2016) Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants, Includes Update No. 1 (2019)

standard by CSA Group, 05/01/2011

More details

Download

PDF AVAILABLE FORMATS IMMEDIATE DOWNLOAD
$289.80 tax incl.

$690.00 tax incl.

(price reduced by 58 %)

1000 items in stock

Full Description

This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components.

Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered.